Insulation Gas underground substation micro water rental

COLORADO RIVER COMMISSION | Power-Tech Engineers Inc. to the large addition of new generation in the area the fault duty at Mead Substation exceeded the equipment rating. PTEI prepared system study and engineered the reconfiguration of the Mead substation with a split bus modification using a reactor to decrease the fault duty. Induced Voltage Analysis on Underground Water Pipelines